• Trail:
  • ECG - East Bay Bike Path (Providence)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
They are doing construction on 2 bridges over the rivers, between Barrington and Warren. The trail is rerouted via auto bridges safely separated from the traffic flow.
This report was generated from the activity log.

0 Comments






  • 0
  • Share with followers