- Trail:
- ECG - East Bay Bike Path (Providence)
- Status:
- All Clear / Green
-
Issue status:
- Condition:
- Ideal - Hero dirt! Not wet but not dry, moisture in soil.
- Reporter Primary Activity:
- Mountain Bike
Description:
They are doing construction on 2 bridges over the rivers, between Barrington and Warren. The trail is rerouted via auto bridges safely separated from the traffic flow.
This report was generated from the activity log.