- Trail:
- Tally Loop (Tally Lake Area)
- Status:
- All Clear / Green
-
Issue status:
- Condition:
- Ideal - Hero dirt! Not wet but not dry, moisture in soil.
- Reporter Primary Activity:
- Mountain Bike
Description:
FAMB Trail Crew cleared 10 trees and cleared drains. The loop is ready to go! Keep a lookout for future trail work on to improve width and climbing ability on the blue side.
Edit: We returned to the tight switchback at the halfway point to lessen the grade and make climbing easier. We also added a small rock ramp to the large root just uphill of the switchback for the same reason.
Edit: We returned to the tight switchback at the halfway point to lessen the grade and make climbing easier. We also added a small rock ramp to the large root just uphill of the switchback for the same reason.
- Work Report:
- trail work done
- 2 paid attendees
- 20 paid hours
- 2 total workers
- 20.0 total work hours