• Trail:
  • JCT (The Tolt)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Variable - some wet spots, or some dusty spots but overall good conditions
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Removed several blow-downs - trail is all clear, but still in building phase with a feature to be added, and the last 1/3 of the trail cleared up for smoother riding.
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 1 volunteer hours
  • 1 total workers
  • 1.0 total work hours
Individual Workers:
hodder709
hours: 1
paid: no

Previous Reports

statusdatedescription
Oct 5, 2026 @ 5:05am
Oct 5, 2026
Drop on the start has been replaced, and the B line to the left has been cleaned up. End of the trail has been cut back and cleaned up, with the... view
Oct 31, 2023 @ 11:29am
Oct 31, 2023
Pulled stump on last 1/3 of trail, and began to surface a small section. Hope to continuing surfacing for another 15 feet or so. Trail is wet... view
Oct 26, 2022 @ 7:37am
Oct 26, 2022
Completed trail work over past week. Cleared last 1/3 of trail of low scrub and raked. Trail is now rideable at speed. Keep in mind this is a... view