• Trail:
  • JCT (The Tolt)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Variable - some wet spots, or some dusty spots but overall good conditions
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Completed trail work over past week. Cleared last 1/3 of trail of low scrub and raked. Trail is now rideable at speed.

Keep in mind this is a non-surfaced trail.

Drop to be added at mid point, ride-thru is possible at this time.
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 4 volunteer hours
  • 1 total workers
  • 4.0 total work hours
Individual Workers:
hodder709
hours: 4
paid: no

Previous Reports

statusdatedescription
Oct 31, 2023 @ 11:29am
Oct 31, 2023
Pulled stump on last 1/3 of trail, and began to surface a small section. Hope to continuing surfacing for another 15 feet or so. Trail is wet... view
May 18, 2023 @ 11:44am
May 18, 2023
Removed several blow-downs - trail is all clear, but still in building phase with a feature to be added, and the last 1/3 of the trail cleared up... view
May 4, 2022 @ 8:36am
May 4, 2022
Downed trees cleared. Keep in mind this is a fresh trail with an unfinished surface and remaining low scrub brush. Ride with caution. view