Description:
Upgraded and improved wooden whale tale entrance/exit and the wall ride. Filled lower sections of wall ride with dirt to create a safer and more progressive entrance onto the wall. Graded area in front of wall ride to create positive drainage. Built back to back table tops on an alternative line by the whale tale and wall ride #1. Started construction of a tabletop to berm jump which brings the lines back together. Compacted trail reroute following wall ride #3. Graded dirt before wall ride #3 to reroute drainage (temporary).
  • Work Report:
  • trail work done

  • 1 paid attendees
  • 11 paid hours
  • 1 total workers
  • 11.0 total work hours
Individual Workers:
trekker23
hours: 11
paid: yes

Previous Reports

statusdatedescription
Aug 8, 2025 @ 9:46am
Aug 8, 2025
Minor vegetation starting to grow into the trail. view
Nov 26, 2024 @ 10:24am
Nov 26, 2024
Trail is mostly good. Looks to not get ridden much. Freeze thaw cycle in effect can make it slippery. view
May 27, 2024 @ 9:23pm
May 27, 2024
view

0 Comments






  • 0
  • Share with followers