• Trail:
  • Donkey trail (Paros)
  • Status:
  • Significant Issue / Amber
  • Issue status:
    Assigned user:
  • Condition:
  • Very Dry - watch those marbles, dusty
  • Reporter Primary Activity:
  • Mountain Bike
Description:
The first wooden bridge has substantial damage. Two planks are missing at the end, you might want to manual over this.

Previous Reports

statusdatedescription
Aug 15, 2023 @ 10:03am
Aug 15, 2023
Almost entire trail is covered by a thick carpet of pine needles. Very slippery. The wooden bridge at the end is still missing two planks. view
Jun 29, 2023 @ 11:24pm
Jun 29, 2023
view
May 19, 2023 @ 11:04am
May 19, 2023
view

0 Comments






  • 0
  • Share with followers