- Trail:
- Top Gun (Maryvale Pines)
- Status:
- Minor Issue / Yellow
-
Issue status: Complete
Assigned user: foxfraser
- Condition:
- Dry -
- Reporter Primary Activity:
- Mountain Bike
Description:
Major erosion (major ruts or slumping), some trail changes may need to be considered. The run in off the road could be improved with either a berm at the start or a line beginning on the other side of the road.
Will need to repack the gully step up run in and upramp as it had developed a significant rut, the ramp has also slumped.
The next area that needs attention is the garden bed (or what used to be..) A-Line jump run in, ramp and runout. The section after this has significant braking bumps and holes, this long section may need to be revised (to be discussed). The pump section rollers are starting to break up a bit and will need some material packed in.
The big drop towards the end of the trail needs its downramp to be repacked and the section after has eroded/developed braking bumps.
Will need to repack the gully step up run in and upramp as it had developed a significant rut, the ramp has also slumped.
The next area that needs attention is the garden bed (or what used to be..) A-Line jump run in, ramp and runout. The section after this has significant braking bumps and holes, this long section may need to be revised (to be discussed). The pump section rollers are starting to break up a bit and will need some material packed in.
The big drop towards the end of the trail needs its downramp to be repacked and the section after has eroded/developed braking bumps.
Previous Reports
Official Report
- Haunted Hills MTB Park
- HHBP