• Trail:
  • Top Gun (Maryvale Pines)
  • Status:
  • Minor Issue / Yellow
  • Issue status: Complete
    Assigned user: foxfraser
    Complete Sep 7, 2024 @ 10:58pm foxfraser
    Open Jul 24, 2023 @ 11:02am foxfraser
  • Condition:
  • Dry -
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Major erosion (major ruts or slumping), some trail changes may need to be considered. The run in off the road could be improved with either a berm at the start or a line beginning on the other side of the road.
Will need to repack the gully step up run in and upramp as it had developed a significant rut, the ramp has also slumped.
The next area that needs attention is the garden bed (or what used to be..) A-Line jump run in, ramp and runout. The section after this has significant braking bumps and holes, this long section may need to be revised (to be discussed). The pump section rollers are starting to break up a bit and will need some material packed in.
The big drop towards the end of the trail needs its downramp to be repacked and the section after has eroded/developed braking bumps.

Previous Reports

statusdatedescription
Mar 11, 2026 @ 3:31pm
Mar 11, 2026
Trail has been logged. Game over man! Game over! view
Oct 31, 2025 @ 2:22am
Oct 31, 2025
Maryvale Pines Trail Network will be closed to the public from November 1st 2025 through to April 2026 for HVP Harvest Operations. Please check... view
Oct 23, 2025 @ 3:12pm
Oct 23, 2025
Maryvale Pines Trail Network will be closed to the public from November 1st 2025 through to April 2026 for HVP Harvest Operations. Please check... view

0 Comments






Official Report

  • Haunted Hills MTB Park
  • HHBP
  • 0
  • Share with followers