- Trail:
- Panic Button (Lower) (Aboyne)
- Status:
- All Clear / Green
-
Issue status:
- Condition:
- Dry -
- Reporter Primary Activity:
- Mountain Bike
Description:
A huge effort by the fantastic volunteers that turn out today to work on Panic Button! Massive thanks all for coming!
It was a full on maintenance day with alot done. Some of the things we did included: Improved drainage on the forest road, where lots of water was appearing. Lots of rotten logs replace with rocks in Berms and topped up with fresh soil. Benched alot of lower sections to improve traction and drainage. Rebuilt hip jump.
It was a full on maintenance day with alot done. Some of the things we did included: Improved drainage on the forest road, where lots of water was appearing. Lots of rotten logs replace with rocks in Berms and topped up with fresh soil. Benched alot of lower sections to improve traction and drainage. Rebuilt hip jump.
- Work Report:
- trail work done
- 13 volunteer attendees
- 39 volunteer hours
- 13 total workers
- 39.0 total work hours
Individual Workers:
anonymous
hours: 3
paid: no
anonymous
hours: 3
paid: no
anonymous
hours: 3
paid: no
anonymous
hours: 3
paid: no
anonymous
hours: 3
paid: no
anonymous
hours: 3
paid: no
anonymous
hours: 3
paid: no
anonymous
hours: 3
paid: no
anonymous
hours: 3
paid: no
anonymous
hours: 3
paid: no
anonymous
hours: 3
paid: no
anonymous
hours: 3
paid: no
Previous Reports
Official Report
- Tarland Trails - Regional Admin Group
- TARLAND