- Trail:
- FTR (South Benson / Wolf Mountain)
- Status:
- Closed / Red
-
Issue status:
- Condition:
- Very Dry - watch those marbles, dusty
- Reporter Primary Activity:
- Mountain Bike
Description:
Road construction and blasting beginning around September 21:
Mosaic will be building roads between Zipper and Meat Draw. This shouldn’t have a major impact on the trails other than closing the vicinity from time to time if blasting is scheduled. Trails will be signed as closed when blasting occurs, and users MUST stay out of the zones and respect all signage during these times. Expect that blasting could require occasional closing of Upper Meat Draw, Meat Draw, The Zipper, Rollercoaster. We anticipate all our works will be complete in early November.
Harvesting beginning around September 26:
Harvesting could begin less than two weeks from now and will impact portions of the trails listed below. Mosaic will sign all the trails as closed. Mosaic plans to do a clean of trails post-harvest. Mosaic expects to be finished in this area in a few months.
• Uterbraten, Uterbraten Climb and Kid Gorgeous
Mosaic will be building roads between Zipper and Meat Draw. This shouldn’t have a major impact on the trails other than closing the vicinity from time to time if blasting is scheduled. Trails will be signed as closed when blasting occurs, and users MUST stay out of the zones and respect all signage during these times. Expect that blasting could require occasional closing of Upper Meat Draw, Meat Draw, The Zipper, Rollercoaster. We anticipate all our works will be complete in early November.
Harvesting beginning around September 26:
Harvesting could begin less than two weeks from now and will impact portions of the trails listed below. Mosaic will sign all the trails as closed. Mosaic plans to do a clean of trails post-harvest. Mosaic expects to be finished in this area in a few months.
• Uterbraten, Uterbraten Climb and Kid Gorgeous