Description:
im trying my best to get the weeping melt springs off and away from the hillbilly trail at the split line away from the two jumps and the rocky boulder lines. its a ton of work. i need lots of time and more drainage pipes. im sorry for any riders who are not expecting the changes at this time. hopefully this rain weekend will help the mud settle more than it is displaced. hopefully i can make both riding lines free of mud for the future for all riders who like both options. i dug up some boulders and sank them into their own weeping springs and found many spots where the ground is just constantly spilling water into the trail and tried plugging them all up yesterday. hill part 2 also has some weeping springs that flow into and get stuck on the trail line making it impossible to pedal for the hump.
i figured out that one of the weeping leaks were some loosely rooted vine maples, the roots were pulling water right into the trail line and i plucked them up. nature is crazy.
cheers and happy sending.

Previous Reports

statusdatedescription
Apr 22, 2026 @ 2:52pm
Apr 22, 2026
view
Oct 6, 2025 @ 3:42pm
Oct 6, 2025
blew and raked most of the leaves off the trail and off water drainage trenches and pipes because winter is coming.... then after.... the wet mud... view
Jul 4, 2025 @ 3:42pm
Jul 4, 2025
there seems to be confusion among some riders in this forest. the path called double track connector is for up hill pedaling towards ladder. the... view

0 Comments






  • 0
  • Share with followers