• Trail:
  • Duel (Hanchurch)
  • Status:
  • Minor Issue / Yellow
  • Issue status: Complete
    Assigned user:
    Complete Aug 20, 2024 @ 2:53am GarethMTBB
    Open Aug 6, 2024 @ 2:44am GarethMTBB
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Left hand line is open despite ongoing jumps construction. Advise checking on the day although a roll-able line is currently in use. The upper duel is also open (between the jump line and the Forest road Road), note this has a large double jump which can be avoided by bearing right.

1 Comment

  • + 1
 The jump line is complete at present. There may be more works on the lower jumps so keep an eye on here.





  • 0
  • Share with followers