• Trail:
  • X Trail lower (Hanchurch)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Variable - some wet spots, or some dusty spots but overall good conditions
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Finished tunneling a pipe through the bottom of the new berm on X. Back fillied and rammed with good stuff, so should be solid. it will probably get blocked at some point but being as it's an indestructible gas type it will be easy topen it with a stick.
  • Work Report:
  • trail work done

0 Comments






  • 0
  • Share with followers