• Trail:
  • Barracuda (Cherry Valley)
  • Status:
  • Minor Issue / Yellow
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
12/19/24 trip report from FB group: Large tree (12+ inches) near junction to top of Baracuda. Also a few small trees seen at the bottom of the road climb. Not sure status of middle.

Local Weather During Report

  • Summary
    Drizzle
  • Temperature
    9° (6°/13°)
  • Precip
    0.67 mm/h
  • Wind
    2.24 km/h
  • Cloud Cover
    96%
  • Humidity
    0.93

Previous Reports

statusdatedescription
Jun 10, 2026 @ 8:23am
Jun 10, 2026
Dirt hero, Roots greasy. Foliage growing over fast this year. [L=https://www.evergreenmtb.org/trails/ride-reports/rr-9639]Evergreen MTB Report[/L] view
Jun 3, 2026 @ 8:04pm
Jun 3, 2026
still needs some clearing but the bad area has been handled. view
May 15, 2026 @ 6:02am
May 15, 2026
Brushed the really bad open section. Trail could still use a top to bottom brushing view

0 Comments






  • 0
  • Share with followers