- Trail:
- La Campista (Valdizarbe-Puente la Reina)
- Status:
- Closed / Red
-
Issue status:
- Condition:
- Unknown - please contribute condition
- Reporter Primary Activity:
- Mountain Bike
Description:
Limpiando un zarzal con el cortasetos para reabrir un antiguo camino
- Work Report:
- trail work done
- 164 feet worked
- 1 volunteer attendees
- 5 volunteer hours
- 1 total workers
- 5.0 total work hours
Individual Workers:
Local Weather During Report
- Summary
MostlyCloudy - Temperature
8° (5°/11°) - Precip
0.09 mm/h - Wind
9.66 km/h - Cloud Cover
83% - Humidity
0.9
