• Trail:
  • Trailfest Wagonroad (B&K)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Variable - some wet spots, or some dusty spots but overall good conditions
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Minor debris and branches on trail but nothing twenty people with leaf rakes couldn’t fix :-). All large blow down cleared from MJB to Witches Brew. New bypass built by Clack Creek to avoid overflow channel.
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 6 volunteer hours
  • 1 total workers
  • 6.0 total work hours
Individual Workers:
thelastwoodcutter
hours: 6
paid: no

Local Weather During Report

  • Summary
    Cloudy
  • Temperature
    (3°/7°)
  • Precip
    0.28 mm/h
  • Wind
    13.1 km/h
  • Cloud Cover
    99%
  • Humidity
    0.9

Previous Reports

statusdatedescription
Jul 12, 2026 @ 9:54am
Jul 12, 2026
Overgrown vegetation on the west end of trail near Witches Brew. view
Jun 13, 2026 @ 4:50pm
Jun 13, 2026
view
Nov 4, 2025 @ 11:18am
Nov 4, 2025
Uppermost section above Roberts Flume Branch is overgrown but definitely passable. Below that was smooth sailing. view

0 Comments






  • 1
  • Share with followers