• Trail:
  • Femur (Vedder Mountain)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Freeze/thaw Cycle -
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Replaced the bridge near the split between the machined line and the single track trail. Addressed the steep corner above, building a retaining wall and installing a drain and grade reversal.
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 3 paid attendees
  • 144 paid hours
  • 4 total workers
  • 144.0 total work hours
Individual Workers:
Graham-Macaulay
hours: 48
paid: yes
anonymous
hours: 48
paid: yes
anonymous
hours: 48
paid: yes

Local Weather During Report

  • Summary
    Clear
  • Temperature
    (1°/7°)
  • Precip
    0 mm/h
  • Wind
    2.86 km/h
  • Cloud Cover
    0%
  • Humidity
    0.49