- Trail:
- Access Road (Boulder Mountain)
- Status:
- Significant Issue / Amber
-
Issue status: Open
- Condition:
- Snow Cover Partial - Incomplete or thin snow cover, could damage equipment or trail
- Reporter Primary Activity:
- Mountain Bike
Description:
Boulder Mountain is currently accessible by bicycle only as motorized traffic is not permitted past the snowmobile parking lot. This means no shuttling. Please park at the main lot before the Jordan River Bridge and pedal from there.
All Boulder trails are currently snow-covered above at least 650 m. Wet, early-season conditions exist.
All Boulder trails are currently snow-covered above at least 650 m. Wet, early-season conditions exist.
Local Weather During Report
- Summary
Clear - Temperature
6° (-1°/7°) - Precip
0 mm/h - Wind
10.85 km/h - Cloud Cover
12% - Humidity
0.29