- Trail:
- Berry Patch Kids Loop (Wahlfield Park)
- Status:
- Closed / Red
-
Issue status:
- Condition:
- Unknown - please contribute condition
- Reporter Primary Activity:
- Mountain Bike
Description:
More trail work, building berms, putting in drain nicks, removing small stumps and roots, cutting brush, getting ready to place the bridge, put up a KCP sign, got supper muddy.
- Work Report:
- trail work done
- 998 feet worked
- 3 volunteer attendees
- 7.5 volunteer hours
- 3 total workers
- 7.5 total work hours
Individual Workers:
Local Weather During Report
- Summary
Cloudy - Temperature
19° (12°/20°) - Precip
0.02 mm/h - Wind
14.01 km/h - Cloud Cover
99% - Humidity
0.79