Description:
Construction equipment at the west end and all the asphalt is gone. Resembles a gravel/dirt road.

Local Weather During Report

  • Summary
    Clear
  • Temperature
    21° (13°/26°)
  • Precip
    0 mm/h
  • Wind
    12.27 km/h
  • Cloud Cover
    5%
  • Humidity
    0.2

Previous Reports

statusdatedescription
May 27, 2026 @ 11:58am
May 27, 2026
view
Jul 24, 2025 @ 4:45pm
Jul 24, 2025
Completely finished and nicely repaved view
Apr 24, 2025 @ 5:28pm
Apr 24, 2025
Construction equipment blocking trail, and a big hole dug to access a pipe view

0 Comments






  • 0
  • Share with followers