- Trail:
- Elevation (Mystic Bike Park)
- Status:
- Significant Issue / Amber
-
Issue status:
- Condition:
- Unknown - please contribute condition
- Reporter Primary Activity:
- Mountain Bike
Description:
Bottom section of trail needs a bunch of work. switch back section has log that's come loose in the right berm. crappy cheat line/drain at the same spot is ruining the entry to the corner.
rock edge armouring down lower is coming loose and additional rock armouring is needed. select roots/rocks also need to be removed to add a bit of curve back into the trail instead of straight lining the flatter section.
this has been done several times in the last 10 years and it's always still a sick trail after proper works.
rock edge armouring down lower is coming loose and additional rock armouring is needed. select roots/rocks also need to be removed to add a bit of curve back into the trail instead of straight lining the flatter section.
this has been done several times in the last 10 years and it's always still a sick trail after proper works.