• Trail:
  • Back Pains (Mackenzie)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Very Dry - watch those marbles, dusty
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Clean up & tidy after berm re-work. Trail needs rain to properly bed down
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 4 volunteer hours
  • 1 total workers
  • 4.0 total work hours
Individual Workers:
kyleleitch (Kyle Leitch)
hours: 4
paid: no

Local Weather During Report

  • Summary
    PartlyCloudy
  • Temperature
    15° (5°/18°)
  • Precip
    0.06 mm/h
  • Wind
    5.95 km/h
  • Cloud Cover
    58%
  • Humidity
    0.46

0 Comments






Official Report

  • Pemberton Valley Trails Association
  • PVTA
  • 0
  • Share with followers