• Trail:
  • Dundee (Calvin Crest Camp)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Variable - some wet spots, or some dusty spots but overall good conditions
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Added a shallow RGD at the location reported on Apr 24, 2025 to drain rainwater off before the turn (pic doesn't show it very well). I also removed the berm from the lower section of the drop and added a steeper side slope so the water will drain off sideways along its length rather than down the center of the trail.
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 2.5 volunteer hours
  • 1 total workers
  • 2.5 total work hours
Individual Workers:
hshear (Howard Shear)
hours: 2.5
paid: no

Local Weather During Report

  • Summary
    PartlyCloudy
  • Temperature
    28° (13°/29°)
  • Precip
    0.08 mm/h
  • Wind
    15.28 km/h
  • Cloud Cover
    52%
  • Humidity
    0.44

Previous Reports

statusdatedescription
May 13, 2026 @ 4:39pm
May 13, 2026
view
Jul 26, 2025 @ 3:18pm
Jul 26, 2025
7/26/25 THOR Trail Day Mowed and String Trimmed most of the trail. Several down trees were removed. Many face slapers and eye pokers trimmed back... view
Apr 29, 2025 @ 11:03am
Apr 29, 2025
Dundee Trail - Cleared a large tree blocking the trail just after the bridge. view

0 Comments






  • 0
  • Share with followers