- Trail:
- Blue Heron (Watershed Trails)
- Status:
- Significant Issue / Amber
-
Issue status:
- Condition:
- Dry -
- Reporter Primary Activity:
- E-Bike
Description:
Large pine tree cross trail around marker 184. Second tree down after 3 board wide bog crossing right before the small bridge crossing about a 16” diameter hard wood.
