• Trail:
  • 5 Bridges (Calvin Crest Camp)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Removed 4 fiberglass posts to be re-purposed for the drops and reroute. Widened the transition into the old trail at the end of the reroute.
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 1 volunteer hours
  • 1 total workers
  • 1.0 total work hours
Individual Workers:
hshear (Howard Shear)
hours: 1
paid: no

Local Weather During Report

  • Summary
    MostlyClear
  • Temperature
    28° (18°/31°)
  • Precip
    0 mm/h
  • Wind
    13.09 km/h
  • Cloud Cover
    37%
  • Humidity
    0.66

Previous Reports

statusdatedescription
Jul 14, 2025 @ 11:00am
Jul 14, 2025
Second option for the climb out of the ravine after 4th bridge (Rooty Climb) - This section is now open to trail users. Finished widening to a... view
Jul 10, 2025 @ 12:00pm
Jul 10, 2025
Second option for the climb out of the ravine after 4th bridge (Rooty Climb) - Continued widening the bench cut. view
Jul 1, 2025 @ 11:00am
Jul 1, 2025
Second option for the climb out of the ravine after 4th bridge - Continued work to widen the bench cut. Cleared the exit and cut in the transition... view

0 Comments






  • 0
  • Share with followers