• Trail:
  • 5 Bridges (Calvin Crest Camp)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
New reroute - String-trimmed the whole section and trimmed branches to widen and raise the corridor further. Added dirt to the log-over and moved dirt to fill in a reverse sloped turn. Will have to wait for more moisture to improve it and other dirt features further. 
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 5 volunteer hours
  • 1 total workers
  • 5.0 total work hours
Individual Workers:
hshear (Howard Shear)
hours: 5
paid: no

Local Weather During Report

  • Summary
    MostlyCloudy
  • Temperature
    22° (12°/24°)
  • Precip
    0 mm/h
  • Wind
    16.03 km/h
  • Cloud Cover
    76%
  • Humidity
    0.42

Previous Reports

statusdatedescription
Jul 14, 2025 @ 11:00am
Jul 14, 2025
Second option for the climb out of the ravine after 4th bridge (Rooty Climb) - This section is now open to trail users. Finished widening to a... view
Jul 10, 2025 @ 12:00pm
Jul 10, 2025
Second option for the climb out of the ravine after 4th bridge (Rooty Climb) - Continued widening the bench cut. view
Jul 1, 2025 @ 11:00am
Jul 1, 2025
Second option for the climb out of the ravine after 4th bridge - Continued work to widen the bench cut. Cleared the exit and cut in the transition... view