• Trail:
  • 5 Bridges (Calvin Crest Camp)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Added two signposts to identify the three different difficulty options for descending to the ravine. Added some drainage at the top of the first drop and cleaned up the approach. Blocked off the 4th option, which was rarely used, had an exit that didn't line up and would have been confusing to add to the signage. Widened the entrance to the blue "Main Trail" path. Added 3 signposts to mark the new reroute. Added an emergency exit signpost to direct trail users from the outlet of the Mindy's Mountain E-exit to the new reroute (this e-exit needs to have downed trees removed - future project).
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 3.5 volunteer hours
  • 1 total workers
  • 3.5 total work hours
Individual Workers:
hshear (Howard Shear)
hours: 3.5
paid: no

Local Weather During Report

  • Summary
    MostlyCloudy
  • Temperature
    25° (19°/27°)
  • Precip
    0 mm/h
  • Wind
    16.64 km/h
  • Cloud Cover
    65%
  • Humidity
    0.63

Previous Reports

statusdatedescription
Jul 14, 2025 @ 11:00am
Jul 14, 2025
Second option for the climb out of the ravine after 4th bridge (Rooty Climb) - This section is now open to trail users. Finished widening to a... view
Jul 10, 2025 @ 12:00pm
Jul 10, 2025
Second option for the climb out of the ravine after 4th bridge (Rooty Climb) - Continued widening the bench cut. view
Jul 1, 2025 @ 11:00am
Jul 1, 2025
Second option for the climb out of the ravine after 4th bridge - Continued work to widen the bench cut. Cleared the exit and cut in the transition... view

0 Comments






  • 0
  • Share with followers