• Trail:
  • The Attic (McIntosh Run)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Dry -
  • Reporter Primary Activity:
  • Mountain Bike
  • Work Report:
  • trail work done

  • 2 volunteer attendees
  • 4 volunteer hours
  • 2 total workers
  • 4.0 total work hours
Individual Workers:
PcDodge
hours: 2
paid: no
anonymous
hours: 2
paid: no

Local Weather During Report

  • Summary
    MostlyClear
  • Temperature
    25° (14°/25°)
  • Precip
    0 mm/h
  • Wind
    13.65 km/h
  • Cloud Cover
    16%
  • Humidity
    0.61

Previous Reports

statusdatedescription
Aug 19, 2026 @ 3:20pm
10 hours
Replace grating on Ramp: 28” x 132”. Boards are 36” Add grating to end of bridge. 42”x42” view
Aug 19, 2026 @ 2:58pm
10 hours
Rotten boards. And trimming needed. 6-10 boards 2x6x32, nailed. view
Aug 19, 2026 @ 2:54pm
10 hours
Braiding. Install post blocking cheater line with marked options. view

0 Comments






Official Trail Reporter i

  • McIntosh Run Watershed Association
  • MRWA
  • 0
  • Share with followers