- Trail:
- Graveyard Slab (Abrams Rock / Village Park)
- Status:
- Significant Issue / Amber
-
Issue status:
- Condition:
- Dry -
- Reporter Primary Activity:
- Mountain Bike
Description:
Large tree across trail, I removed most of the branches, but a large (4” diameter) branch at bar height will need to be cut out with a saw.
- Work Report:
- trail work done
- 1 volunteer attendees
- 1 volunteer hours
- 1 total workers
- 1.0 total work hours
Individual Workers:
Local Weather During Report
- Summary
Clear - Temperature
22° (14°/27°) - Precip
0 mm/h - Wind
7.56 km/h - Cloud Cover
0% - Humidity
0.6
