Description:
Bridge has been rebuilt
There is a very muddy section towards the end of the trail - suggestion would be to use the "green link to avoca" shortcut to access the avoca rd. To continue to the klipspringer turn right at the road, to do yellow or run turn left. All gates must be closed

Local Weather During Report

  • Summary
    Clear
  • Temperature
    18° (11°/22°)
  • Precip
    0 mm/h
  • Wind
    17.41 km/h
  • Cloud Cover
    5%
  • Humidity
    0.69

Previous Reports

statusdatedescription
May 17, 2026 @ 11:10am
May 17, 2026
Trail has been cleared of storm debris. Some short wet patches - photos attached of the trickier bits... view
Feb 14, 2026 @ 11:09am
Feb 14, 2026
Trail running nicely - switchbacks to bridge eroded but ride-able. The descent to the switchbacks is now very rocky. The muddy section has... view
Feb 14, 2025 @ 3:32am
Feb 14, 2025
Bridge is currently being repaired and will be operational soon. If you are happy to hop a little gap (+/_ 1m) you can walk across the structure view

0 Comments






Official Trail Reporter i

  • Klipspringer MTB / Walker Bay Fynbos Conservancy Admin Group
  • Klipspringer
  • 0
  • Share with followers