• Trail:
  • Beech Drop (Baileys Trail System)
  • Status:
  • Significant Issue / Amber
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
  • Expired on: Sep 27, 2025 9:00pm
Description:
RACE ADVISORY: BAILEYS DIRT FONDO
This report was generated from a bulk trail report update.

Local Weather During Report

  • Summary
    MostlyClear
  • Temperature
    26° (14°/27°)
  • Precip
    0 mm/h
  • Wind
    5.28 km/h
  • Cloud Cover
    18%
  • Humidity
    0.58

Previous Reports

statusdatedescription
Oct 3, 2026 @ 6:12pm
Oct 3, 2026
Tree down 8.45 inches diameter. view
Aug 23, 2026 @ 6:35am
Aug 23, 2026
view
Jul 26, 2026 @ 9:32pm
Jul 26, 2026
8" tree reported on 7/25 has not been removed. The 14" tree has been removed. view

0 Comments






Official Trail Reporter i

  • Outdoor Recreation Council of Appalachia - Regional Admin Group
  • ORCA
  • 0
  • Share with followers