• Trail:
  • Galactic Scheisse (Diamond Head)
  • Status:
  • Significant Issue / Amber
  • Issue status:
    Assigned user:
  • Condition:
  • Variable - some wet spots, or some dusty spots but overall good conditions
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Between October and November 2025, the Ministry of Forests will be installing cross ditches and removing old log culverts using a mini excavator. Signage will be installed with good view distance for the descending riders, to use caution and make contact with the operator before passing.

Local Weather During Report

  • Summary
    Cloudy
  • Temperature
    11° (10°/14°)
  • Precip
    0.52 mm/h
  • Wind
    6.49 km/h
  • Cloud Cover
    95%
  • Humidity
    0.93

Previous Reports

statusdatedescription
Nov 11, 2026 @ 5:34pm
Nov 11, 2026
There is one small cluster of trees down as well as two other one-off trees down on the trail. The cluster is above the Intergalactic access road. view
Aug 30, 2026 @ 10:22am
Aug 30, 2026
view
Aug 16, 2026 @ 6:16am
Aug 16, 2026
view

0 Comments






Official Report

  • Britannia Beach Trails Association - Regional Admin Group
  • BBTA
  • 1
  • Share with followers