Description:
Full trail tread raked out, loose rocks removed, lips for jump and rollers all tuned up from the meadow to the bottom. New side lips added to remaining table tops that did not previously have them.
  • Work Report:
  • trail work done

  • 999 feet worked
  • 4 paid attendees
  • 36 paid hours
  • 4 total workers
  • 36.0 total work hours
Individual Workers:
dhpinner555 (Galen Carter)
hours: 9
paid: yes
JustinThyme (Justin Time)
hours: 9
paid: yes
Devin Doran
hours: 9
paid: yes

Local Weather During Report

  • Summary
    MostlyClear
  • Temperature
    (5°/26°)
  • Precip
    0 mm/h
  • Wind
    0.44 km/h
  • Cloud Cover
    20%
  • Humidity
    0.74

0 Comments






Official Report

  • Wasatch Trails Foundation - Regional Admin Group
  • WTF
  • 0
  • Share with followers