Description:
The bridge located on Turkey Knob Trail one-half mile from the Pinnacle Mountain gate is currently closed. The trail will still be open up to the bridge and can still be used as an “out-and-back trail” as far as the bridge.

Local Weather During Report

  • Summary
    Clear
  • Temperature
    22° (11°/22°)
  • Precip
    0 mm/h
  • Wind
    5 km/h
  • Cloud Cover
    3%
  • Humidity
    0.51

Previous Reports

statusdatedescription
Apr 30, 2026 @ 8:31am
Apr 30, 2026
Turkey knob bridge there is a sign that says it is closed but it was open view
Feb 18, 2026 @ 8:18am
Feb 18, 2026
Single Track Trails OPEN view
Jan 29, 2026 @ 6:14pm
Jan 29, 2026
Single Track Closure view

0 Comments






Official Trail Reporter i

  • Friends of Dupont Forest - Regional Admin Group
  • FODF
  • 0
  • Share with followers