Description:
Section of bridge had collapsed and required rebuilding and reinforcement with new wood. Section was rebuilt and reinforced. It is now solid but will need to be addressed next season as the rest of the bridge has many sections with rotten wood. There is still one section that is connected to the hand rail which requires attention and is a safety concern if anyone leans on the railing. New wood will be required as the existing wood has rooted out.
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 2.5 volunteer hours
  • 1 total workers
  • 2.5 total work hours
Individual Workers:
StevosWorld
hours: 2.5
paid: no

0 Comments






  • 0
  • Share with followers