- Trail:
- Coiler (Cypress Mountain)
- Status:
- All Clear / Green
-
Issue status:
- Condition:
- Variable - some wet spots, or some dusty spots but overall good conditions
- Reporter Primary Activity:
- Mountain Bike
Description:
Work report deleted for the 3rd or 4th time by the Cypress overlords.
Not sure why this keeps getting deleted but I'll make sure to repost as it does.
Added a culvert and fixed up the exit of Coiler. She's runner better than ever get after it before they destroy the trail for their new blue flow trail...
Not sure why this keeps getting deleted but I'll make sure to repost as it does.
Added a culvert and fixed up the exit of Coiler. She's runner better than ever get after it before they destroy the trail for their new blue flow trail...
- Work Report:
- trail work done
- 1 volunteer attendees
- 4 volunteer hours
- 1 total workers
- 4.0 total work hours
Individual Workers:
Local Weather During Report
- Summary
MostlyCloudy - Temperature
5° (3°/6°) - Precip
0 mm/h - Wind
6.14 km/h - Cloud Cover
84% - Humidity
0.63