• Trail:
  • Martha Creek Downhill (Sale Mountain)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
60 hours of work done September 2025, paid for by TransBC Enduro.

Major tune-up done for full length of trail including:
- removal of 6 downed trees across trail, as well as several danger trees
- Wide brush cutting to 2m corridor along middle portion of the trail (between the upper and lower road crossings)
- Top-to-bottom rake job, as well as repairing the tread surface in a few steeper spots below the first road crossing.
- Sight lines improved top-to-bottom
  • Work Report:
  • trail work done

  • 2 volunteer attendees
  • 60 volunteer hours
  • 2 total workers
  • 60.0 total work hours
Individual Workers:
PeterWojnar (Peter Wojnar)
hours: 30
paid: no
jacobtooke (Jacob Tooke)
hours: 30
paid: no

Local Weather During Report

  • Summary
    Cloudy
  • Temperature
    -4° (-4°/-0°)
  • Precip
    0 mm/h
  • Wind
    2.75 km/h
  • Cloud Cover
    92%
  • Humidity
    0.93

Previous Reports

statusdatedescription
Aug 9, 2025 @ 11:37am
Aug 9, 2025
Tree down but it’s an easy hop. view
Jul 9, 2025 @ 8:31am
Jul 9, 2025
Tree down at 3km mark and 4.2km mark. view
Jul 4, 2025 @ 7:49pm
Jul 4, 2025
Trail is good to go. 2 trees still to clear and one that’s needs a ride around built due to size of tree / route ball. One patch of snow left on... view

0 Comments






  • 0
  • Share with followers