- Trail:
- Back Door DH (Westsyde)
- Status:
- Significant Issue / Amber
-
Issue status:
- Condition:
- Ideal - Hero dirt! Not wet but not dry, moisture in soil.
- Reporter Primary Activity:
- Mountain Bike
Description:
Several chainsaw trees down in the usual spot about halfway down where the new structures are. The wood jump that finishes in a skinny is on the side of the trail (not sure if that was intentional?). Further along as the trail turns to follow the wl river, there's another chainsaw tree that is awkwardly hung up. I cleared what I could (3 trees) with a handsaw.
- Work Report:
- trail work done
- 1 volunteer attendees
Local Weather During Report
- Summary
MostlyCloudy - Temperature
18° (6°/18°) - Precip
0 mm/h - Wind
5.38 km/h - Cloud Cover
72% - Humidity
0.39
