• Trail:
  • RollerFlowster (Don Valley)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Variable - some wet spots, or some dusty spots but overall good conditions
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Kudos to the trail fairies - amazing bridge work!!
This report was generated from the activity log.

Local Weather During Report

  • Summary
    Cloudy
  • Temperature
    (0°/9°)
  • Precip
    0 mm/h
  • Wind
    9.46 km/h
  • Cloud Cover
    99%
  • Humidity
    0.46

Previous Reports

statusdatedescription
Aug 11, 2026 @ 7:41am
2 days
Large tree down across trail, blocking trail view
Aug 9, 2026 @ 3:00pm
Aug 9, 2026
Try down before the last downhill that ends the trail. view
Aug 9, 2026 @ 11:45am
Aug 9, 2026
tree down on the slow part before the switchbacks near the end of the trail view

2 Comments

  • + 1
 Wow yeah I just saw that today. Those bridges are like something you'd see at a bike park.
  • + 1
 It really is a work of art. Kudos to the DV Rodents.





  • 0
  • Share with followers