• Trail:
  • Bangor Reef Track (Yackandandah MTB Track Network)
  • Status:
  • Significant Issue / Amber
  • Issue status:
    Assigned user:
  • Condition:
  • Variable - some wet spots, or some dusty spots but overall good conditions
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Medium tree down across trail, blocking trail about 50m above Highway to Hill intersection. 400mm cut.

Local Weather During Report

  • Summary
    MostlyCloudy
  • Temperature
    10° (10°/16°)
  • Precip
    0 mm/h
  • Wind
    6.83 km/h
  • Cloud Cover
    87%
  • Humidity
    0.92

Previous Reports

statusdatedescription
Aug 11, 2026 @ 8:46pm
Aug 11, 2026
Removed 5 trees from redex above Bangor reef track view
Aug 10, 2026 @ 10:44pm
Aug 10, 2026
redex benching of the crossing at Finlay Spur Track view
Aug 7, 2026 @ 4:54pm
Aug 7, 2026
large tree removed. 10 minutes of shovel work still nodded to get the root ball dirt off the trail view

0 Comments






  • 0
  • Share with followers