• Trail:
  • Aspen Trail (Bethpage State Park)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Very Dry - watch those marbles, dusty
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Trimmed overgrowth from I m evil friends loop to the paved path
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 4.5 volunteer hours
  • 1 total workers
  • 4.5 total work hours
Individual Workers:
Hawklax
hours: 4.5
paid: no

Local Weather During Report

  • Summary
    Drizzle
  • Temperature
    27° (16°/27°)
  • Precip
    0.05 mm/h
  • Wind
    6.29 km/h
  • Cloud Cover
    32%
  • Humidity
    0.5

Previous Reports

statusdatedescription
Jun 28, 2026 @ 1:08pm
Jun 28, 2026
Removed garbage and cleared dead fall view
Jun 25, 2026 @ 9:03am
Jun 25, 2026
view
Jun 24, 2026 @ 2:32pm
Jun 24, 2026
Big tree branch down, probably 6 inches in diameter. I can’t lift it myself.. partially covering the trail view

0 Comments






Official Trail Reporter i

  • CLIMB Bethpage State Park Admins
  • CLIMB-BP
  • 0
  • Share with followers