• Trail:
  • The Bridges (Bundadung Trails)
  • Status:
  • Closed / Red
  • Issue status:
    Assigned user:
  • Condition:
  • Dry -
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Closed for trail works 27th July-8th August 2026

Local Weather During Report

  • Summary
    Clear
  • Temperature
    (7°/16°)
  • Precip
    0 mm/h
  • Wind
    11.03 km/h
  • Cloud Cover
    2%
  • Humidity
    0.68

0 Comments






  • 0
  • Share with followers