• Trail:
  • Peterson Creek 293 (Jewel Basin)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Dry -
  • Reporter Primary Activity:
  • Mountain Bike
Description:
FAMB has put a week of work in on this trail! We raked some of the worst of the loose rock sections, re-treaded all the switchbacks below the Peterson Sidehill connector, and brushed the worst of the face/hand whackers! Our intent was to make it easier to pedal up, and safer to ride down. Please take care on the switchbacks, the dirt will be loose until we get some rain.
  • Work Report:
  • trail work done

Local Weather During Report

  • Summary
    Clear
  • Temperature
    22° (15°/32°)
  • Precip
    0 mm/h
  • Wind
    2.09 km/h
  • Cloud Cover
    10%
  • Humidity
    0.47

Previous Reports

statusdatedescription
Jul 20, 2026 @ 7:20am
Jul 20, 2026
Running great! view
Jul 3, 2026 @ 2:45pm
Jul 3, 2026
FAMB went to the intersection with Quintonkon and cleared the remaining obstructions and cut back trees that weren't cut wide enough. This... view
May 28, 2026 @ 9:53am
May 28, 2026
About 10 trees down before Quintonkin. view

0 Comments






Official Report

  • Flathead Area Mountain Bikers - Regional Admin Group
  • FAMB
  • 0
  • Share with followers