• Trail:
  • Evil Friends Loop (Bethpage State Park)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Unknown - please contribute condition
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Reshaped berm and added drain to inside as per park management request. Built two rolling grade dip drains before and after berm to divert water before it arrives at berm. Removed concrete from top of drop and added dirt then fortified drain and rolling grade dip. Will come back to finish cheese wedge launch and add a drain and mellow out sides of borrow pit.
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 3 volunteer hours
  • 1 total workers
  • 3.0 total work hours
Individual Workers:
sick4surf
hours: 3
paid: no

Local Weather During Report

  • Summary
    MostlyClear
  • Temperature
    29° (23°/33°)
  • Precip
    0.09 mm/h
  • Wind
    6.7 km/h
  • Cloud Cover
    21%
  • Humidity
    0.8

1 Comment

  • + 0
 Thank you!





Official Trail Reporter i

  • Concerned Long Island Mountain Bicyclists - Regional Admin Group
  • CLIMB
  • 1
  • Share with followers