• Trail:
  • Clark Kent (McIntosh Run)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Minor erosion, overgrown vegetation, etc.
Trimmed vegetation, lopped overhanging branches and exposed roots, removed stumps and fallen trees from alongside trail, picked & re-seated rocks.
Clark Kent is now complete, from Hartlen entrance to Divide junction.
  • Work Report:
  • trail work done

  • 2 volunteer attendees
  • 5 volunteer hours
  • 2 total workers
  • 5.0 total work hours
Individual Workers:
PcDodge
hours: 2.5
paid: no
anonymous
hours: 2.5
paid: no

Local Weather During Report

  • Summary
    Cloudy
  • Temperature
    19° (16°/20°)
  • Precip
    0.09 mm/h
  • Wind
    11.49 km/h
  • Cloud Cover
    100%
  • Humidity
    0.8

Previous Reports

statusdatedescription
Sep 3, 2026 @ 9:40am
Sep 3, 2026
Final dozen boards replaced on boardwalk. Some gravel & fill added at a few low spots, eg. over culvert, and near the intersection with Milk... view
Sep 1, 2026 @ 12:27pm
Sep 1, 2026
Cleared all sides of the boardwalk at Hartlen Pk, plus replaced a dozen soft boards. view
Aug 19, 2026 @ 2:20pm
Aug 19, 2026
Overgrown. And holes appearing. Fill needed. view

0 Comments






Official Trail Reporter i

  • McIntosh Run Watershed Association
  • MRWA
  • 0
  • Share with followers