• Trail:
  • Shake It Off (Don Valley)
  • Status:
  • Significant Issue / Amber
  • Issue status:
    Assigned user:
  • Condition:
  • Unknown - please contribute condition
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Major trail damage.
The Easternmost section is mostly clear. There's a small living tree that's fallen over the trail on the far East end (that section has a maintainer group so I didn't touch it) and there's some quicksand approaching the Ontario Line construction site.
Going East from the Ontario Line construction site, the trail has extensive flooding blocking any access.
Further East where the trail crosses the Don Trail, the two giant logs were pushed together and block the trail (pictured). There's also extensive flooding later on (pictured). I went into the trail from the other side and pulled the bridge back into position.
The bench cut sections East of there were fine.
After the trail crosses the Don Trail again East of there, there's a massive pile of debris blocking the trail (pictured).

Local Weather During Report

  • Summary
    MostlyCloudy
  • Temperature
    21° (18°/26°)
  • Precip
    0 mm/h
  • Wind
    5.71 km/h
  • Cloud Cover
    84%
  • Humidity
    0.93

Previous Reports

statusdatedescription
Aug 23, 2026 @ 9:20am
Aug 23, 2026
Great work on clearing overgrowth view
Aug 7, 2026 @ 5:06pm
Aug 7, 2026
It's only muddy in the spots that are always muddy. The overgrowth has been trimmed back a lot recently. The Rodents and Toronto Trail Runners... view
Aug 6, 2026 @ 3:42pm
Aug 6, 2026
Wet but the soil seems stable enough to ride. view

0 Comments






  • 0
  • Share with followers