• Trail:
  • Upper Freek Trail (Pheasant Glen)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Variable - some wet spots, or some dusty spots but overall good conditions
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Overgrown a bit but not bad considering it hasn’t been touched in a while. Still long section and fair bit of work for Dale and myself. Cleared boardwalk sections, all clean! some pallet rungs broken by hikers or horse need repair, lots of material stacked on site ready. Pretty dry!! Two sections of softer soil was all, no mud. The climb out bypass needs finishing with border logs and dragging down fill for 25-30’
  • Work Report:
  • trail work done

  • 2 volunteer attendees
  • 2 volunteer hours
  • 2 total workers
  • 2.0 total work hours
Individual Workers:
kus
hours: 1
paid: no
dale
hours: 1
paid: no
This report was generated from the activity log.

Local Weather During Report

  • Summary
    Cloudy
  • Temperature
    16° (13°/18°)
  • Precip
    0 mm/h
  • Wind
    4.36 km/h
  • Cloud Cover
    89%
  • Humidity
    0.77

Previous Reports

statusdatedescription
Aug 22, 2026 @ 10:47am
Aug 22, 2026
view
Apr 13, 2026 @ 2:32pm
Apr 13, 2026
Passable, more pallets need work, fairly dry with some muck view
Jan 26, 2026 @ 9:15pm
Jan 26, 2026
Cleared leaves, a number of branches, features blown clean and swept. There’s about a dozen slats needing repair on the midsection of the trail,... view

0 Comments






Official Report

  • Friends of Pheasant Glen Trails - Regional Admin Group
  • FOPG
  • 0
  • Share with followers