• Trail:
  • Overton Main Loop (Overton Preserve)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Variable - some wet spots, or some dusty spots but overall good conditions
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Removed sand, built new drains, cleared old drains and fixed erosion on the Main Trail between Loop 1 and the Granny Rd. Loop
  • Work Report:
  • trail work done

  • 1 volunteer attendees
  • 2 volunteer hours
  • 1 total workers
  • 2.0 total work hours
Individual Workers:
Nedermeyer
hours: 2
paid: no

Local Weather During Report

  • Summary
    Cloudy
  • Temperature
    16° (15°/19°)
  • Precip
    0 mm/h
  • Wind
    5.4 km/h
  • Cloud Cover
    98%
  • Humidity
    0.66

Previous Reports

statusdatedescription
Sep 19, 2026 @ 4:39pm
Sep 19, 2026
3 fallen trees removed from the Mill Rd. Loop just after the entrance from the Mill Rd. Lot. The 3rd tree split in half about 25 feet above... view
Sep 19, 2026 @ 12:32pm
Sep 19, 2026
Cleared out the sand and put in new drains on the main trail at the start of the Mill Rd. Loop. view
Sep 19, 2026 @ 12:26pm
Sep 19, 2026
Main trail in the Mill Rd. Loop section less than 1/4 mile from the lot. 3 fallen trees sawed and removed. The 3rd tree was split and still... view

0 Comments






Official Report

  • CLIMB Overton Admins
  • CLIMB-OV
  • 0
  • Share with followers