• Trail:
  • Otoe Coaster (Platte River State Park)
  • Status:
  • All Clear / Green
  • Issue status:
    Assigned user:
  • Condition:
  • Ideal - Hero dirt! Not wet but not dry, moisture in soil.
  • Reporter Primary Activity:
  • Mountain Bike
Description:
Installed a patch fix to prevent further erosion on the first fence line downhill, where water is running from the top of the line to the bottom. Filled the worst rut near the bottom and opened up the nick before the step down midway through to alleviate damage with the rains forecasted this week.

We should consider another machine-built set of repairs to push the water off this line with another 3-4 grade reversals from top to bottom. This iteration lasted 3 years.
  • Work Report:
  • trail work done

  • 1 paid attendees
  • 4 paid hours
  • 1 total workers
  • 4.0 total work hours
Individual Workers:
spargenc23
hours: 4
paid: yes

Local Weather During Report

  • Summary
    PartlyCloudy
  • Temperature
    20° (16°/25°)
  • Precip
    0.01 mm/h
  • Wind
    10.51 km/h
  • Cloud Cover
    59%
  • Humidity
    0.89

Previous Reports

statusdatedescription
Sep 22, 2026 @ 8:54am
Sep 22, 2026
Large tree down across trail, blocking trail view
Sep 16, 2026 @ 7:45pm
Sep 16, 2026
Debermed a downhill portion of Otoe that was holding water and making the trail choppy due to erosion. Added a RGD to influence water runoff view
Aug 21, 2026 @ 7:11am
Aug 21, 2026
Finished drains and tread compaction after a night of drying view

0 Comments






Official Trail Reporter i

  • Trails Have Our Respect - Regional Admin Group, Southeast Nebraska
  • THOR
  • 0
  • Share with followers