More Filters
datedescriptioncondition
Sep 28, 2026 @ 6:18pm (America/Chicago)
Sep 28, 2026
mtb Installed a patch fix to prevent further erosion on the first fence line downhill, where water is running from the top of the line to the bottom. Filled the worst rut near the bottom and opened up the nick before the step down midway through to alleviate damage with the rains forecasted this week.

We should consider another machine-built set of repairs to push the water off this line with another 3-4 grade reversals from top to bottom. This iteration lasted 3 years.
reporter
Idealview
Sep 22, 2026 @ 10:54am (America/Chicago)
Sep 22, 2026
mtb Large tree down across trail, blocking trail reporter Variableview
Sep 16, 2026 @ 9:45pm (America/Chicago)
Sep 16, 2026
mtb Debermed a downhill portion of Otoe that was holding water and making the trail choppy due to erosion. Added a RGD to influence water runoff
reporter
Variableview
Aug 21, 2026 @ 9:11am (America/Chicago)
Aug 21, 2026
mtb Finished drains and tread compaction after a night of drying
reporter
Idealview
Aug 20, 2026 @ 6:51pm (America/Chicago)
Aug 20, 2026
mtb Repaired erosion on the small step down landing, installed RGd at the bottom and restored the RGd above the feature as well
reporter
Idealview
Aug 14, 2026 @ 7:00pm (America/Chicago)
Aug 14, 2026
mtb Fixed erosion in the step up face on the Otoe beginning section
reporter
Idealview
Jul 31, 2026 @ 6:57pm (America/Chicago)
Jul 31, 2026
mtb Addressed the stump issue and erosion before the 2nd step up in Otoe Coaster. Restored drains above the step up to prevent erosion issue from reoccurring.
reporter
Idealview
Jul 18, 2026 @ 11:13am (America/Chicago)
Jul 18, 2026
mtb Idealview
Jul 10, 2026 @ 3:02pm (America/Chicago)
Jul 10, 2026
mtb Opened up the original drains and elevated grade reversals on the climb out of Otoe (next to fence line).
reporter
Dryview
Jul 8, 2026 @ 6:10pm (America/Chicago)
Jul 8, 2026
mtb Trimmed the south edge by the RV campground as well the shortcut loop which were the most hairy sections.

Repaired erosion on the step down and step up feature, opening the drains back up on both sides by cutting a nick on the north side and reopening the grade reversal drain on the south side next to the step down feature. Used the excess dirt for the nick to build a larger case pad for the step up.
reporter
Dryview
Jun 18, 2026 @ 9:23am (America/Los_Angeles)
Jun 18, 2026
mtb Dirt work on Otoe berm and rutting
Dryview
Jun 13, 2026 @ 2:32pm (America/Chicago)
Jun 13, 2026
mtb Idealview
Jun 11, 2026 @ 5:36pm (America/Chicago)
Jun 11, 2026
mtb Repaired from the entrance to the first berm damage from the deluge, restored 4 RGDs to help with the watershed.
reporter
Variableview
May 22, 2026 @ 10:00am (America/Los_Angeles)
May 22, 2026
mtb Mowing and Timming
reporter
Dryview
Apr 25, 2026 @ 7:01am (America/Chicago)
Apr 25, 2026
mtb Idealview
Apr 5, 2026 @ 4:18pm (America/Chicago)
Apr 5, 2026
mtb Idealview
Jan 7, 2026 @ 1:39pm (America/Chicago)
Jan 7, 2026
mtb There are a few tacky spots that show up in the afternoon but other than that is it perfect. If it gets wet again it’ll be frozen in the morning and wet in the afternoon Freeze/thaw Cycleview
Oct 20, 2025 @ 4:45pm (America/Chicago)
Oct 20, 2025
mtb DIRT:
2nd G-out Return Climb is washing out again. reporter
Idealview
Sep 16, 2025 @ 1:57pm (America/Chicago)
Sep 16, 2025
mtb reporter Idealview
Sep 10, 2025 @ 12:28pm
Sep 10, 2025
mtb DIRT:
Minor erosion (trail braiding, small ruts developing, brake bumps) reporter
Idealview
Sep 10, 2025 @ 12:27pm
Sep 10, 2025
mtb DIRT:
Minor erosion (trail braiding, small ruts developing, brake bumps) reporter
Idealview
Sep 10, 2025 @ 12:26pm
Sep 10, 2025
mtb DIRT:
Minor erosion (trail braiding, small ruts developing, brake bumps) reporter
Idealview
Aug 19, 2025 @ 9:28am
Aug 19, 2025
mtb TREES:
west side trees down as of 8/19
PRIORITY
Otoe Coaster: Across the trail. High Traffic area.

The other ones, can be ridden around but they could catch a bike and make someone crash.

River Run: Stumpy one.
Eastbound: Brushy One. reporter
Idealview
Aug 8, 2025 @ 10:54am
Aug 8, 2025
mtb Idealview
Aug 3, 2025 @ 12:50pm
Aug 3, 2025
mtb Idealview

Login to view work report summary