- Trail:
- FlowMama (CAMBA Seeley Cluster)
- Status:
- All Clear / Green
-
Issue status:
- Condition:
- Dry -
- Reporter Primary Activity:
- Mountain Bike
Description:
10/7/26 Trail Steward Ride: PARTIAL FlowMama_South (HiPoint to S24 to S17). Trail is in good riding condition although heavily leaf covered. Cleared 12” diameter red oak blow down (with Silky Big Boy back pack saw) located 0.5 miles north of S17/Winding Pines. Note: this probably is the 18” tree down reported earlier.
- Work Report:
- trail work done
- 2 volunteer attendees
- 1 volunteer hours
- 2 total workers
- 1.0 total work hours
Individual Workers:
Tom D.
hours: 0.5
paid: no
Lori D.
hours: 0.5
paid: no
Local Weather During Report
- Summary
MostlyClear - Temperature
15° (2°/17°) - Precip
0 mm/h - Wind
10.09 km/h - Cloud Cover
17% - Humidity
0.47